Sunday, April 29, 2018

RV Trailer 4

Lower part of front wall temporarily set in place.

© Peter Mitchell
Made a cardboard template for the curve of the roof.

© Peter Mitchell
Working on side walls.

© Peter Mitchell

© Peter Mitchell

The side walls temporarily set in place.

© Peter Mitchell


Thursday, April 5, 2018

RV Trailer 3

Put down some canopy tape to cushion between the fibreglass on the deck bottom and the aluminum frame.

© Peter Mitchell
Then bolted the deck onto the frame and started with one wall and the centre support/dividing wall under the bed platform. The walls are structured panels with 1" rigid foam insulation sandwiched between 1/8" plywood. First wall is under a pile of bags filled with gravel to weight it down while the glue dries.

© Peter Mitchell
© Peter Mitchell