Sunday, April 29, 2018
Thursday, April 5, 2018
RV Trailer 3
Put down some canopy tape to cushion between the fibreglass on the deck bottom and the aluminum frame.
Then bolted the deck onto the frame and started with one wall and the centre support/dividing wall under the bed platform. The walls are structured panels with 1" rigid foam insulation sandwiched between 1/8" plywood. First wall is under a pile of bags filled with gravel to weight it down while the glue dries.
© Peter Mitchell |
© Peter Mitchell |
© Peter Mitchell |
Subscribe to:
Posts (Atom)