Put down some canopy tape to cushion between the fibreglass on the deck bottom and the aluminum frame.
|
© Peter Mitchell |
Then bolted the deck onto the frame and started with one wall and the centre support/dividing wall under the bed platform. The walls are structured panels with 1" rigid foam insulation sandwiched between 1/8" plywood. First wall is under a pile of bags filled with gravel to weight it down while the glue dries.
|
© Peter Mitchell |
|
© Peter Mitchell |
No comments:
Post a Comment