Started adding the rigid foam insulation on the roof, two layers of 1/2", with wood added along the edge between the cross pieces. The photo below shows the edge piece with some temporary cross pieces screwed on to hold the rigid foam in place on the curve until we get the outside sheathing on.
|
© Peter Mitchell |
From the front with just one layer of foam insulation and not held down yet.
|
© Peter Mitchell |
Also started preparing the inside back storage area for priming and painting. The bed platform is pulled out of the way to make this step easier.
|