Tuesday, August 14, 2018

RV Trailer 8

© Peter Mitchell
 Started the wiring.

© Peter Mitchell

© Peter Mitchell
Part of the bed platform put into place.

© Peter Mitchell
And the outside sheathing is all in place now.

© Peter Mitchell

© Peter Mitchell

Tuesday, August 7, 2018

Savary Island

© Peter Mitchell
Took a break from the trailer work today and went to Savary Island. Beautiful day out on the beach, nice for swimming, and we were there early enough to get this driftwood shelter to use for shade.

RV Trailer 7

© Peter Mitchell
Started adding the rigid foam insulation on the roof, two layers of 1/2", with wood added along the edge between the cross pieces. The photo below shows the edge piece with some temporary cross pieces screwed on to hold the rigid foam in place on the curve until we get the outside sheathing on.

© Peter Mitchell
 From the front with just one layer of foam insulation and not held down yet.

© Peter Mitchell
 Also started preparing the inside back storage area for priming and painting. The bed platform is pulled out of the way to make this step easier.

© Peter Mitchell

Wednesday, July 25, 2018

RV Trailer 6

© Peter Mitchell
The inner layer for the roof installed with cross pieces to provide support. Plan to use two layers of 1/2" rigid foam which should bend nicely to follow the curve of the roof.

© Peter Mitchell
Used these scraps to push up on the 1/8" plywood under each cross piece while the glue dried. Actually glued the first couple but then changed to use epoxy.

© Peter Mitchell
We have build out the front. This shows the inner layer of 1/8" plywood tacked down.

© Peter Mitchell
This is the inside of the front.

© Peter Mitchell
This is the back passenger side storage compartment where we will put the cooler style fridge, showing the tray on sliders.

Monday, July 16, 2018

RV Trailer 5

It has been a while since posting so here are some photos bringing this up to date.

© Peter Mitchell

© Peter Mitchell

© Peter Mitchell

© Peter Mitchell

Sunday, April 29, 2018

RV Trailer 4

Lower part of front wall temporarily set in place.

© Peter Mitchell
Made a cardboard template for the curve of the roof.

© Peter Mitchell
Working on side walls.

© Peter Mitchell

© Peter Mitchell

The side walls temporarily set in place.

© Peter Mitchell


Thursday, April 5, 2018

RV Trailer 3

Put down some canopy tape to cushion between the fibreglass on the deck bottom and the aluminum frame.

© Peter Mitchell
Then bolted the deck onto the frame and started with one wall and the centre support/dividing wall under the bed platform. The walls are structured panels with 1" rigid foam insulation sandwiched between 1/8" plywood. First wall is under a pile of bags filled with gravel to weight it down while the glue dries.

© Peter Mitchell
© Peter Mitchell